Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | One Year |
Still deciding? Get samples of US$ 0.1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name
|
Carbon Steel Pipe/Tube
|
Wall Thickness
|
1.5mm-100mm
|
Length
|
3m-12m
|
Outer diameter
|
22mm-650mm
|
Tolerance
|
Wall Thickness:±0.05MM Length:±6mm Outer Diameter:±0.3MM
|
Shape
|
Round, Square, Rectangle, Oval
|
Material
|
Q195-Q345, 10# ,20#,45#,195-Q345, Gr.B-Gr.50, S235JR, SS400, SPHC,BS-040A10 ,16mn, 40cr, 42crmo, 27simn, 12cr1mov, 15crmo, Gcr15,25mn2
|
Standard
|
ASTM, DIN, JIS, BS, GB
|
Certificate
|
ISO, CE, BV
|
Delivery time
|
Delivered within 7-15 days after receipt of deposit
|
Package
|
1. Packed with 8 bundles tightened with metal belt and plastic wrapped if need
2. According to customer's requirement |
Application
|
Widely used in furniture,interior decoration, fluid pipeline, petroleum and natural gas industry, drilling, pipeline, structure
|
Standard seaworthy export packing:
3 layers of packing, inside is kraft paper, water plastic film is in the middle and outside GI steel sheet to be covered by steel strips with lock.
1,Export seaworthy packing: a water proof paper + an inhibitor film + a steel sheet cover with steel edge protectors and sufficient steel straps
2.Packaging detail:as customer's requirements.
1.Do you provide free samples?
Yes, we can provide free sample for testing,buyer should bear all the shipping costs.
2.How long is your delivery time?
Generally it is 3-7 days if the goods are in stock or it is 7-15 days if the goods are not in stock, it is according to quantity.
3.How can we guarantee quality?
Always a pre-production sample before mass production;always final Inspection before shipment.And we can also accept the third-party inspection and quarantine.
4.Why should you buy from us not from other suppliers?
Diversified products, direct supply from manufacturer.
5.What is your terms of payment ?
We accept T/T ,L/C etc.
The payment method can be negotiated by both parties according to the actual situation.