Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer

Product Details
Customization: Available
After-sales Service: One Year
Warranty: One Year
Still deciding? Get samples of US$ 800/Ton
Request Sample
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
443406.54 USD
Plant Area
210 square meters
  • Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
  • Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
  • Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
  • Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
  • Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
  • Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
Find Similar Products
  • Overview
  • Detailed Photos
Overview

Basic Info.

Model NO.
square pipe
Type
Seamless and Welded
Technique
Cold Drawn
Material
Carbon Steel
Surface Treatment
Galvanized
Usage
Machinery Industry, Chemical Industry, Construction & Decoration
Section Shape
Square
Payment Term
Fob CIF CFR EXW
Standard
Normal
Transport
Sea Freight
Packing
Follow Your Requirement
Transport Package
Customer Made
Specification
customer made
Trademark
WG
Origin
China
Production Capacity
50000PCS/Year

Product Description

Detailed Photos
Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer

 

Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer

Square

Dimension: 20mm*20mm-500*500mm

Round

Dimention:21.3mm-219.1mm

Rectangular

Dimension: 40mm*20mm-600mm*400mm

Wall thickness

0.45mm-20mm

Length

5.8m-12m ,by customer's requirements

Zinc coating

Pre-galvanized steel square tube: 60g/m2-150g/m2;

Galvanized steel square tube:200g/m2-400g/m2;

Standards

ASTM A500  GB/T3094 BS1387

Materials

st37,st42,S195,Q235

Technique

ERW Welded square tube

Packing

1.Big OD: in bulk

2.Small OD :packed by steel strips

3.woven cloth with 7 slats

4.according to the requirements of customers

Usage

Mechanical & manufacture, Steel structure,

Ship building, Bridging, Automobile chassis

Main market

Middle East, Africa, Asia and some European country and America ,Australia

Country of origin

Tianjin, China

Productivity

10,000 Metric Tons pet Month

Remark

1. Payment terms : T/T ,L/C

2. Terms of trade : FOB, CFR, CIF, EXW

3. Minimum order : 20 tons

4. Lead time : on or before 30 days

Any other questions, pls feel free to contact me. Your kindly mail will be treated seriously and reply within one work day.

Prime Material Zinc Coated Steel Square Tube Building Iron Pipe ManufacturerPrime Material Zinc Coated Steel Square Tube Building Iron Pipe ManufacturerPrime Material Zinc Coated Steel Square Tube Building Iron Pipe ManufacturerPrime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
Prime Material Zinc Coated Steel Square Tube Building Iron Pipe ManufacturerPrime Material Zinc Coated Steel Square Tube Building Iron Pipe ManufacturerPrime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
Prime Material Zinc Coated Steel Square Tube Building Iron Pipe ManufacturerPrime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer
FAQ

1.What kind of work does your company do? 

Our company is a professional manufacturer.

We mainly produces stainless steel plate/pipe/coil/lead round bars,as well as galvanized plate/pipe/coil/lead wire/corrugated sheet,etc.

2.Do you provide free samples?
Yes, we can provide free sample for testing,buyer should bear all the shipping costs.
3.How long is your delivery time?
Generally it is 3-7 days if the goods are in stock or it is 7-15 days if the goods are not in stock, it is according to quantity.
4.How can we guarantee quality?
Always a pre-production sample before mass production;always final Inspection before shipment.
5.Why should you buy from us not from other suppliers?
Diversified products, direct supply from manufacturer.
6.What is your terms of payment ?
We accept T/T ,L/C ,Western union, paypal ,Credit Insurance Order etc.
The payment method can be negotiated by both parties according to the actual situation.
Prime Material Zinc Coated Steel Square Tube Building Iron Pipe Manufacturer

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier